On CNET: Keep your PC secure in 2009
BNET Business Network:
BNET
TechRepublic
ZDNet

By Stephen Shankland
Posted on ZDNet News: Jul 2, 2004 10:58:00 PM

IBM plans to announce its new generation of Unix servers July 13, kicking off the second phase of the debut of its Power5 processors, sources said.

Big Blue is expected to announce models with two, four and 16 processors, sources familiar with the plans said. Later, IBM will sell a top-end 64-processor system, but that model isn't expected this quarter.

IBM declined to comment for this report.

Big Blue has long run in third place in the fiercely competitive Unix server market, trailing leader Sun Microsystems and second-place Hewlett-Packard. But IBM has been gaining Unix share: In 2003, IBM's revenue grew 13 percent to $4.1 billion, while Sun's shrank 16 percent to $5.4 billion and HP's shrank 4 percent to $5.3 billion, according to research firm Gartner.

IBM is converging two server lines, the pSeries models that run IBM's AIX version of Unix and the iSeries line that runs OS/400 and its successor, i5/OS. The two lines have been growing closer for years, but with the launch of the Power5-based systems, the hardware is identical. Through technology called "partitioning," a single system can run AIX, i5/OS and Linux.

Big Blue launched its first Power5-based systems with i5/OS in May, emphasizing the increasing unification in its server group by dropping the iSeries label in favor of eServer i5.

The AIX systems will follow a similar naming convention with the eServer p5 name. For example, the 16-processor models will be called the i5 570 or the p5 570, depending on whether they're sold with an i5/OS or AIX focus.

Like the existing Power4 models, Power5 includes two processing units on each slice of silicon, a design called "dual-core." However, each Power5 core can run two separate sequences of instructions, called "threads," making each slice of silicon function somewhat like four conventional processors.

The Power5 processors are expected to be offered at speeds of 1.5GHz, 1.65GHz and 1.9GHz, sources familiar with the products said. They're built on a manufacturing process that permits chip with features 130 nanometers (billionths of a meter) wide, though a coming Power5+ version will be built with a 90-nanometer process that should allow smaller, faster and cooler chips.

The chips also take a step beyond the Power4 models in partitioning. Where Power4 could accommodate one operating system per processor, Power5 can handle as many as 10, a technology IBM calls "micro-partitioning." For example, a p5 570 can simultaneously run 160 separate operating systems.

IBM has decades of partitioning experience with its mainframe line, but Sun pioneered the technique for Unix servers, a larger market. A key part of IBM's p5 and i5 partitioning is called HyperVisor, technology IBM drew from its mainframe line.

One major improvement in partitioning from Power4 to Power5 is better "virtualization," an abstraction technique that lets multiple partitions share the same network and storage adapters. With Power4, each partition required its own adapter, a significant practical constraint.

Partitioning is in vogue with companies trying to reduce the profusion of low-end servers--hard to manage and often sitting idle much of the time--with a small number of larger servers whose resources are efficiently used.

Sun's next version of Unix, Solaris 10, will bring new partitioning abilities through a software feature that will work not just on models using its and Fujitsu's Sparc processors, but also on machines based on Intel and Advanced Micro Devices processors.

  • Talkback
  • Most Recent of 21 Talkback(s)
Exactly,
ONLY IF, a `computer' for you is just a tall rack with boxes, cables, leds that makes a loud noise. All look the same (by EA logic) => they are the same.

It's OK enterprise analist (Read the rest)
Posted by: michael-t Posted on: 07/05/04 You are currently: Logged In as: a Guest  | Login | Terms of Use
Wonder what it'll cost ???  Bit's_Conscience | 07/03/04
I am thankful to  michael-t | 07/03/04
£2500 if i remember correctly  crocd | 07/05/04
£2500 if i remember correctly  crocd | 07/05/04
Unix is going down the tubes  Enterprise Analyst | 07/03/04
Why?  Linux User 147560 | 07/04/04
Maybe because of...  B.O.F.H. | 07/05/04
UNIX is THE king in heavy duty environments  michael-t | 07/03/04
Now that the Power5 is out.....  middle of nowhere | 07/03/04
Use Intel powered blades and save $$$  Enterprise Analyst | 07/03/04
Why?  Linux User 147560 | 07/04/04
Less expensive  Enterprise Analyst | 07/04/04
Thank you  Linux User 147560 | 07/04/04
Exactly,  michael-t | 07/05/04
Long live the mainframe reborn!  B.O.F.H. | 07/03/04
Old days of mainframe  Enterprise Analyst | 07/04/04
First you bash AIX  Linux User 147560 | 07/04/04
(NT) Actually, it is now called z/OS . . . wink  Bit's_Conscience | 07/04/04
That was actually a response to your post about the Blade Server.  B.O.F.H. | 07/05/04
BOFH, the mainframes still run much of the key back office work...  Bit's_Conscience | 07/04/04
I am well aware of where tehy are used!  B.O.F.H. | 07/05/04

What do you think?

Storage Virtualization

  • In virtual environments, storage matters. It influences everything from application availability and disaster readiness to power consumption and TCO. Bottom line: Don’t defeat the purpose of your consolidation by skimping on storage.
  • From our sponsors
  • EMC Corporation
  • ESG applauds new CX4 in analyst report According to ESG, it's hard to find much missing in the new CLARiiON CX4. Read the report to learn more »
advertisement
Click Here